Two Types of Office Demo — Both Done in One Visit
NC office demolition breaks into two jobs. We handle both.
Tenant Improvement (TI) Demo
TI demo removes a previous buildout so the space is ready for new occupancy. That includes:
- Drop ceilings and ceiling grid
- Partition walls and glass office fronts
- Built-in millwork, cabinetry, and casework
- Raised flooring and data room infrastructure
One important note: partition walls in commercial spaces are frequently load-bearing at the ceiling grid even when they don’t look structural. We work off a scope document and coordinate with the building owner before anything comes down.
Office Clearouts
Furniture and fixture clearouts are high-volume jobs — the speed depends on crew size and truck rotation.
- A 10,000 sq ft open-plan office with 50 workstations typically takes 1–2 full days
- Cubicle systems (Herman Miller, Steelcase, panel-based systems) need to come apart in a specific sequence — we know the order
- Filing systems, equipment, and loose furniture all load in the same trip
On documents: we haul document boxes, but shredding is not part of our service. If you have significant document volume, confirm your destruction protocol before clearout day.